• Tide Info: Nov / Dec / Beach Width (11/15/08): ~325'
  • next Board Meeting: January 10; 10:00AM;
    location Long & Foster Agenda
    note: Board Meetings are open to Community Members
  • click HERE for form to request password
  • Home Page Events Property Owners (password request) Meeting Minutes MBA Board (only)
  • Rules and Regulations
  • Building Regulations
  • Real Estate
  • Committees
  • Longterm Projects
  • Live Cams
  • LIVE Weather
  • Businesses
  • Items for Sale
  • Driveway culvert elevations Short Bayberry Errett Bridge Addy Evergreen
    Although DNREC has indicated they can update our survey of driveway culverts and assist us with planning an improved system, they have a sufficient backlog that they cannot start until this winter.
    location 1 3 5 7 9 11 13 15 17 19w 19e 21w 21e 23 25 27
    diameter 12 12 12 12 12 12 12 12 12 12 12 12 12 12 8 8
    length 36 21 21 21 21 21 21 21 20 21 21 21 21 21 15 20
    material Conc Conc Metal Metal Conc Conc Conc Metal Metal Conc Conc Conc Conc Conc Metal Metal
    misc                                
    west end 60 190 360 495 660 810 925 1020 1210 1290 1360 1430 1510 1590 1795 1910
    west bot 3.2 3.2 3.6 3.8 3.8 4 4.6 4 5.4 5.2 5.4 5.2 5.9 6 7.6 8
    east bot 3.6 3.4 3.9 3.9 3.9 4.2 4.4 3.8 5.2 5.2 5.4 5 5.8 6.3 7.8 8
                                     
    location 2 4 6 8w 8e 10 12 14w 14e 16w 16e 18 20      
    diameter 18 12   8 12   12 12 0 12 15 15 12      
    length 16 25   20 20   21 21 0 21 17 17 21      
    mat'l Plas Metal   Metal Metal   Conc Metal Metal Metal Conc Conc Conc      
    misc     collapsed?                          
    west end 325 445   670 740   1060 1220   1350 1510 1510 1725      
    west bot 3 3.4   4 3.9   3.9 4.1   4.6 4.8 4.8 6.6      
    east bot 2.7 3.8   3.9 3.9   4.2 4.3   4.6 4.8 4.8 6.6      
    Location=street address (usually); culvert diameter in inches; length in feet; west bot/east bot are elevations of bottom of designated culvert end; west end is distance along the appropriate ditch of the west ("downstream") end of the culvert.
    Note that the zero points (lengthwise) of most ditches is the center of the ditch along the east side of DE361. The zero points for the Bridge Rd south, Addy Rd north and Evergreen ditches are the west end of the respective culverts under Pine Rd; the zero point of the Addy Rd south ditch is its intersection with the Evergreen ditch (roughly 300' south of Addy Rd); the zero point of the Bridge Rd north ditch is the south end of the culvert under Bridge Rd.
    Data is from a 1992 Delaware Soil and Conservation survey (locating ditch heights and conduit locations), which was done relative to an arbitrary elevation. 2000 Artesian Water survey has elevations of all main culverts under roads-measured relative to Mean Lower Low Sea Level-the standard the USGS uses, and was used to convert the relative elevations to absolute. Tides at Jefferson Creek generally range between 0.5 and 1.5 feet above MLLSL; see this USGS site for specifics.