| 2012 MBA Drainage Work | |||||
| Street | ADDR | PipeSize | NOTES: | ||
| Name | # | 12" | 10" | 8" | "dw"="driveway culvert"; # denotes street address |
| Errett: | 1 | 6 | replace dw and pipe/fill all ditch (include surface T just e of dw) (pipe outlet elev .1' above DelDOT culvert W of fence; slope .1' per 100') | ||
| 3 | 4 | replace and pipe/fill ditch from #3 driveway to W prop line (incl surface T just W of dw; follow above slope; last piece of pipe has .2' slope per 20') | |||
| 5 | 1.5 | replace 30' dw; lower ditch-slope .1' per 100' | |||
| 7 | 1.5 | replace 30' dw; lower ditch-slope .1' per 100' | |||
| 4 | 2 | replace 30' dw (outlet elev .1' above inlet of #2) (ditch OK for this year) | |||
| Short: | 1 | 2 | backfill around cleanout boxes (MBA to replace T with second cleanout box in early January) | ||
| 3 | backfill betw dw and W prop line; riprap E side of dw | ||||
| 5 | 3 | replace 60' -new elevation .5' above outlet at #3; old pipe (too deep) remains; new pipe slightly closer to street | |||
| Bayberry: | 4 | 5 | replace 30' dw (raise ditch bottom about 4") (pipe/backfill addtl 70' dtich at homeowner expense-slope .1' per 100'; last pipe .2' per 20') | ||
| 6 | 1.5 | replace 30' dw (raise ditch-slope .1' per 100') (remove vegetation between ditch and road) | |||
| 8 | 1.5 | replace 30' dw (raise ditch-slope .1' per 100') | |||
| 13 | reseat 30' dw at exist elev (dip in the middle) | ||||
| Bridge: | 12 | 1.5 | replace flatter (dnstream end OK; upstream end 6"' too high) | ||
| 14 | 1.5 | replace 30' dw (lower about 7") | |||
| 16 | 1.5 | (asphalt driveway-try to leave undistrubed) | |||
| Addy: | 2 | 3 | investigate utilities in the way of new cross-road pipe to tie S ditch into N drainbox by #1 (design now; FUTURE WORK) | ||
| PIPE: | |||||
| TOTAL | 26 | 6.5 | 3 | ||
| OnHand | 30 | 17 | 15 | ||